
Expert EV Charger Installations
Electric Vehicle Charger Installations
EV charger installations in Kirribilli need careful planning from the start. Many properties here are older-era terraces, period flats, or apartment blocks with limited parking, and the electrical setup varies considerably. The first step is always a proper site assessment: where parking sits relative to the board, what the board can support, and what routing is realistic for your specific property.
For houses and terraces with off-street parking, we assess the switchboard and plan the cable route. For apartments, there's an owners corporation approval step, and we'll help you understand what's needed for your building before you commit to anything. Period properties get extra care around routing to keep the installation visually appropriate for the building.
Note: If your Kirribilli property is in a heritage conservation area, get in touch before assuming that creates a problem. In most cases we can complete the work with minimal visual impact, and the heritage controls rarely prevent the electrical work itself.

Done efficiently and perfectly. I'm very happy that the power is now back on during this awkward period of Christmas rush.
Get Your EV Charger Installed Today
Positive Vibes Electrical works regularly across the Lower North Shore and is experienced with the variety of property types Kirribilli brings. Every installation starts with an honest assessment of what's possible at your property, clear pricing, and a result that's tested, certified, and done properly.
Expert Electricians for EV Charger Installations
Thank you Drew for your concise explanation of the work, professional attitude, super neat and clean work and caring conduct around our pets. We highly recommend...

EV Charger FAQ's
When a switchboard is at capacity, which is common in older Kirribilli apartments and period properties near Carabella Street, an EV charger circuit cannot simply be added on top of what is already there. The board needs attention before the charger can be installed safely.
The most common resolution is a switchboard upgrade. If the board is a modern unit with adequate rail space, a licensed electrician can often consolidate or replace existing protection devices to free up space, or fit a dual-function RCBO in a tandem arrangement where space is tight. If the board is genuinely at capacity with no practical way to add a circuit, a sub-board can be installed to extend available positions.
For older properties with an original fuseboard or ceramic fuse installation, the situation usually requires a full board replacement. These boards cannot accommodate modern RCBO protection, which is mandatory for an EV charger circuit. Replacing the board resolves the space problem and brings the whole installation up to current safety requirements in one step. We assess the board during the site visit and include any required board work in the quote before the job begins.
Heritage-listed and character properties present specific considerations for cable routing. The core electrical requirement is the same as any other installation: a dedicated cable run from the switchboard to the charger with appropriate protection. How that cable gets there depends on the building construction, the heritage controls that apply, and what level of finish the owner wants.
For period properties in Kirribilli, brick and sandstone facades are common. Running concealed cable through masonry requires core drilling and careful sealing, and it is achievable where the route allows. Internal routing through ceiling cavities or wall voids, exiting at a discreet point near the parking area, keeps all conduit out of sight. Where concealment is not practical, surface conduit on an external wall can be used with the conduit type and colour matched to the building where possible.
Heritage overlay controls vary by property. Kirribilli falls within the North Sydney local government area, which includes heritage items and conservation areas. Some listed properties have specific constraints around facade alterations. We check what controls apply before quoting and discuss the appropriate routing with you. In most cases, an EV charger installation can be completed with minimal visual impact even on a listed property.
Shared driveways and common laneways are a common feature in closely settled streets, particularly for terrace properties. Whether an EV charger installation is straightforward depends on where the parking space sits and where the cable needs to run to reach it.
If your parking is on your own title and the cable route stays within your property, the installation is straightforward and no neighbour consent is needed. The shared driveway is relevant only as a physical access path, not as a legal consideration for the electrical work.
Where the cable route needs to cross shared land, for example to reach a parking space at the rear accessed through a common laneway, written agreement with the relevant parties is required before any fixed cable can be installed. This might involve the body corporate, a shared ownership arrangement, or direct consent from the neighbour whose title the route would cross. We identify these situations during the site assessment and advise on what approvals are needed. In many cases, an alternative route within your own title avoids the issue entirely. We don't start work where approvals are required until you have the right agreements in place.
A plug-in hybrid uses a Type 2 connector for AC home charging, the same standard connector used by all home Level 2 chargers in Australia. The charger hardware is identical regardless of whether the car is a plug-in hybrid or a full battery electric vehicle. A single home charger can serve both types without any modification.
The main practical difference is battery size. A PHEV battery is typically between 8 and 20kWh. At a 7.2kW charge rate, a PHEV can fully charge in one to three hours. A full battery electric vehicle typically has 50 to 100kWh of capacity, taking seven to fourteen hours at the same charge rate. The PHEV finishes charging early in the evening while a full BEV may still be charging when you wake up.
This affects installation planning in one specific way. A PHEV owner who doesn't intend to upgrade to a full battery vehicle may find a 3.6kW single-phase charger adequate, since it draws only 16A and puts less demand on the supply while still filling a PHEV overnight. For anyone planning to switch to a full BEV within a few years, a 7.2kW installation from the start avoids having to upgrade the circuit again when the car changes. We can advise on which output suits your current vehicle and longer-term plans during the site assessment.


Make A Booking Today















